[Job Story] Terex Installs Bulky and POPs Waste Processing Plant in the UK
Terex Recycling Systems has announced the installation of a bulky and POPs waste processing plant at BIFFA, a well-established UK waste management company. “The project was to build a shredding facility that would take bulky waste from household recycling centres across Milton Keynes, shred it to a size suitable for incineration, while also removing any […] [Job Story] Terex Installs Bulky and POPs Waste Processing Plant in the UK published on The HeavyQuip Magazine.
Terex Recycling Systems has announced the installation of a bulky and POPs waste processing plant at BIFFA, a well-established UK waste management company.

“The project was to build a shredding facility that would take bulky waste from household recycling centres across Milton Keynes, shred it to a size suitable for incineration, while also removing any metals present in the waste stream”
Collaborating with Terex Recycling Systems to plan, design and execute the project, BIFFA installed a user-friendly plant that features a fully integrated electrical control system with an intuitive interface. At the heart of the plant is the TDS-820SE low speed, high torque shredder with twin shafts and teeth to provide efficient volume reduction of waste materials. The machine’s two-metre-long shafts, featuring fully welded teeth, offer throughput and material reduction.

“We needed a shredder capable of handling anything from household waste, reducing it to the right size. After reviewing several machines, we chose the TDS-820SE. Since the shredder is fixed and indoors, we opted for the electric version. Terex even provided the opportunity for us to trial a diesel version beforehand, which helped confirm our decision.”

By incorporating the advanced separation and shredding technologies of the TDS-820SE, the BIFFA Milton Keynes plant enables POPs waste to be managed in full compliance with these regulations.
“When we’re processing bulky waste, we can direct it one way, and when we switch to POPs waste, we can divert it into a separate RORO skip. This setup allows us to keep the two waste types completely separate, just as required.
The system has been superb—it removes ferrous and non-ferrous metals and allows us to shred and divert bulky and POPs waste into separate streams. The brief we gave to Terex Recycling Systems at the outset has been fully delivered, and we’re extremely pleased with the outcome.”
Andy Tapp explained.
The system also includes a permanent over-band magnet for the removal of ferrous metals and an eddy current separator for the extraction of non-ferrous metals. The result is a shredded product that is ready for further processing at a waste-to-energy plant.

“We are proud to support BIFFA with their ambitious efforts at Milton Keynes. The installation of our TDS-820SE electric shredder, combined with advanced separation technologies is a great example of how engineering innovation and customer collaboration can drive real environmental progress.”
Michael McMenamin, Regional Sales Manager for Terex Recycling Systems added.
[Job Story] Terex Installs Bulky and POPs Waste Processing Plant in the UK published on The HeavyQuip Magazine.
machineryasia
