Hampton Bridge lifted into place
The main span of the Moxon Architects-designed 210m Hampton Bridge, part of a planned all weather active travel route over the Evesham flood plain, has been lifted into place.
The main span of the Moxon Architects-designed 210m Hampton Bridge, part of a planned all weather active travel route over the Evesham flood plain, has been lifted into place.
Read Full Article: The Construction Index
machineryasia
