Federal Funds Totaling $25.8M Slated to Replace Readsboro Bridge in Southern Vermont

Federal funds of $25.8M will replace the Readsboro Bridge in Vermont. The new span, costing $33M total, will enhance safety and resiliency, replacing the aging structure built in 1954. Construction begins in summer, lasting until winter 2028, with improved design to withstand climate-related challenges....

Federal Funds Totaling $25.8M Slated to Replace Readsboro Bridge in Southern Vermont
Federal funds of $25.8M will replace the Readsboro Bridge in Vermont. The new span, costing $33M total, will enhance safety and resiliency, replacing the aging structure built in 1954. Construction begins in summer, lasting until winter 2028, with improved design to withstand climate-related challenges....