TCC-800 Completes Foundation Work for 5000-Acre Development

AWA completed foundation work for a 4,700-acre development in Palm Coast using a Link-Belt TCC-800 crane. The project involved driving sheet piling between existing pine forests and a bridge, preparing the area for residential units. The efficient crane operation decreased the rental time needed for the work....

AWA completed foundation work for a 4,700-acre development in Palm Coast using a Link-Belt TCC-800 crane. The project involved driving sheet piling between existing pine forests and a bridge, preparing the area for residential units. The efficient crane operation decreased the rental time needed for the work....