Lift off for £4bn Net Zero Teesside Power scheme

The world’s first gas-fired power station with carbon capture and storage is now ready to move from drawing board to construction.

Lift off for £4bn Net Zero Teesside Power scheme

The world’s first gas-fired power station with carbon capture and storage is now ready to move from drawing board to construction.

Read Full Article: The Construction Index